The information presented below is intended for retails and generators. If you are not a retailer or generator please return to the applications form page.
The Applications and Queuing Policy specifies the process that will be followed in processing electricity transfer applications and connection applications.
Electricity transfer applications should be completed to obtain or modify an entry or exit service (usually completed by a retailer or generator).
Connection applications should be completed if you require (or may require) a network change (may be completed by a customer, customer's retailer or generator.
| New connection point | Electricity transfer applications | Connection applications |
|---|---|---|
| Residential | Retailer & Generator Portal - New connection service order | Domestic Underground Supply Application |
| Commercial - distribution system | Design and Quotation Application | |
| Commercial - transmission system | Transmission Load Application (XSL 328kb) | |
| Primary producer | Design and Quotation Application | |
| Unmetered supply | Unmetered supplies (PDF 139kb) | |
| Temporary supply | Temporary Supply Application (PDF 118kb) | |
| Existing connection point (Distribution Load) | Electricity transfer applications | Connection applications |
| Select different distribution system covered service (33 kV or below) – all reference services except A7 & A8 | Electricity Transfer Application (WORD 274kb) | N/A |
| Decrease contracted capacity (CMD) – distribution system (33 kV or below) | ||
| Select different distribution system covered service (33 kV or below) – CMD reference services A7 & A8 only | CMD Request Application (WORD 295kb) | Design and Quotation Application |
| Increase contracted capacity (CMD) - distribution system (33 kV or below) | ||
| Existing connection point (Transmission Load) | Electricity transfer applications | Connection applications |
| Select different transmission system covered service (66 kV or above) - all reference services except A11 | Electricity Transfer Application (WORD 274kb) | N/A |
| Decrease contracted capacity (CMD) -transmission system (66 kV or above) | ||
| Select transmission system covered service (66 kV or above) - CMD reference service A11 only | CMD Request Application (WORD 295kb) | Transmission Load Application (XSL 328kb) |
| Increase contracted capacity (CMD) - transmission system (66 kV or above) | ||
| Generating plant | Electricity transfer applications | Connection applications |
| New distribution system connection point (33 kV or below) | Included in the connection application form | Distribution Generator Application (XSL 343kb) |
| Modification to generating plant - distribution system (33 kV or below) | ||
| New transmission system connection point (66 kV or above) | Transmission Generator Application (XSL 177kb) | |
| Modification to generating plant -transmission system (66 kV or above) | ||
| Other | Electricity Transfer Applications | Connection Applications |
| Re-energise existing de-energised connection point - distribution system (33 kV or below) | Retailer & Generator Portal - Re-energisation service order | Design and Quotation Application |
| Re-energise existing de-energised connection point - transmission system (66 kV or above) |
| |
| New access contract | Contact Networks Access team | N/A |
| Combine multiple connection points into a single connection point - distribution system (33 kV or below) | Electricity Transfer Application (WORD 274kb) | Design and Quotation Application |
| Separate single connection point into multiple connection points - distribution system (33 kV or below) | ||
| Combine multiple connection points into a single connection point - transmission system (66 kV or above) |
| |
| Separate single connection point into multiple connection points - transmission system (66 kV or above) | ||
| Modify distribution system (33 kV or below) | N/A | Design and Quotation Application |
| Modify transmission system (66 kV or above) |
|